Summary of Contents for VTS Medical Systems Ventus VVS005s-030s
Page 1
AHU and CBX types: VVS021c-150c VVS005s-030s Note In case aof outdoor installation of the Air Handling Units (VVSc range only): All cables should be secured by means of flexible conduits. Any auxiliary junction boxes must meet minimum protection degree for outdoor conditions. STEP 1 Installation of the AHU on site STEP 2...
Page 2
STEP 3 Checking AHU configuration according to tech card Water heater Water or DX cooler Water or electric heater Water or DX cooler Elements description STEP 4 Main swich Q0 Termianl X1 - 1x230V Terminal T1 for supply of circulation pump Installation of the temperature sensor on the duct STEP 5 Connection of the duct...
Page 3
STEP 7 Connection of the fire alarm system, if exists Fire al. Heater al. Cool al. B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers...
Page 5
Duct temp. sensor ater PreHeater T. supply T. room T. outside T. heater NTC10k NTC10k NTC10k NTC10k B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers...
Page 6
Electric heater Make holes for power supply Instal the glands lead the cables and control cables * Control cables out of delivery Power supply cables * drilling only for EH section in casing (for EH duct drilling not required) The power supply cable ! for 3 switches, always connect the middle one (in high power) 1~230V 3~400V...
Need help?
Do you have a question about the Ventus VVS005s-030s and is the answer not in the manual?
Questions and answers