Download Print this page

VTS Medical Systems Ventus VVS005s-030s Manual

Ahu and cbx types

Advertisement

Quick Links

AHU and CBX types:
VVS005s-030s
Note
!
In case aof outdoor installation of the Air Handling Units (VVSc range only):
All cables should be secured by means of flexible conduits.
Any auxiliary junction boxes must meet minimum protection degree for outdoor conditions.
STEP 1
Installation of the AHU on site
STEP 2
Unpacking automation elements
VVS021c-150c
Copyright © VTS sp. z o.o.
001
Wszelkie prawa zastrzeżone.
Wszelkie prawa zastrzeżone.
All rights reserved.
Все права зарезервированы.
Ver. 2020.03.06

Advertisement

loading
Need help?

Need help?

Do you have a question about the Ventus VVS005s-030s and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for VTS Medical Systems Ventus VVS005s-030s

  • Page 1 AHU and CBX types: VVS021c-150c VVS005s-030s Note In case aof outdoor installation of the Air Handling Units (VVSc range only): All cables should be secured by means of flexible conduits. Any auxiliary junction boxes must meet minimum protection degree for outdoor conditions. STEP 1 Installation of the AHU on site STEP 2...
  • Page 2 STEP 3 Checking AHU configuration according to tech card Water heater Water or DX cooler Water or electric heater Water or DX cooler Elements description STEP 4 Main swich Q0 Termianl X1 - 1x230V Terminal T1 for supply of circulation pump Installation of the temperature sensor on the duct STEP 5 Connection of the duct...
  • Page 3 STEP 7 Connection of the fire alarm system, if exists Fire al. Heater al. Cool al. B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers...
  • Page 4 Valve actuator for water heater Main heater Heating Recovery Cooling B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 24V, 0-10V 24V, 0-10V 24V, 0-10V Humidi Supply Humidi Room Pump Dampers...
  • Page 5 Duct temp. sensor ater PreHeater T. supply T. room T. outside T. heater NTC10k NTC10k NTC10k NTC10k B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers...
  • Page 6 Electric heater Make holes for power supply Instal the glands lead the cables and control cables * Control cables out of delivery Power supply cables * drilling only for EH section in casing (for EH duct drilling not required) The power supply cable ! for 3 switches, always connect the middle one (in high power) 1~230V 3~400V...
  • Page 7 Control cable PreHeater / ReHeater G0 A03 G0 A04 Reserve Reserve G0 D01 0-10V 0-10V Pump Stop / Start C6 D06 Global al. Stop / Start Terminal 1 G0 DI2 Heater al. NO / NC Heating Recovery Cooling 24V, 0-10V 24V, 0-10V 24V, 0-10V B- GND...
  • Page 8 Optional water or DX cooler alarm Fire al. Heater al. Cool al. NO / NC NO / NC NO / NC B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room...
  • Page 9 DX heater DX Heater / Cooler (Reversible operation) Heating Recovery Cooling 24V, 0-10V 24V, 0-10V 24V, 0-10V B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers...
  • Page 10 Connection of the optional elements HMI Advanced B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room Pump Dampers Reserve Reserve Dampers Cool 1 Cool 2 Heat 2 24V, RS-485 - Modbus RTU...
  • Page 11 CO2 sensor B- GND B- GND HMI Basic 24V, RS-485 - Modbus RTU 24V, RS-485 - Modbus RTU B- GND G0 B- GND B- GND B- GND G0 D01 G0 G A02 G0 G0 A03 G0 A04 G0 D02 G0 D03 G0 D04 G0 D05 Humidi Supply Humidi Room...
  • Page 12 Power connection VVS021c-150c Main swich Q0 3~400V Cable out of delivery VVS005s-030s 1~230V Cable out of delivery Copyright © VTS sp. z o.o. All rights reserved. Ver. 2020.09.04 Wszelkie prawa zastrzeżone. Wszelkie prawa zastrzeżone. Все права зарезервированы.

This manual is also suitable for:

Ventus vvs021c-150c