1) INSTALLATION INSTRUCTIONS

2) PLP SHOWER PANEL with thermostatic valve
3) PRECAUTIONS FOR USE (The product guarantee depends on compliance with these instructions)
ASSEMBLY AND USE
For products delivered with filters, these must be installed in accordance with the instructions.
Before commissioning any of our valves, it is essential to carefully drain the pipes that can damage the mechanisms or water
passages (PRESTO® heads that can be dismantled from front).
Recommended operating pressure according to NF EN 816: 1 to 5 bars.
CLEANING
The chrome-plated coating of PRESTO® valves must be cleaned only with soapy water.
Abrasive, acid, alkaline or ammonia-based household products are prohibited.
MAINTENANCE
Never lubricate the internal mechanism, particularly the caps and valve seals.
4) Fixed shower heads with swivel jets
5) Supply
6) Top inlet
7) Rear inlet
8) Stainless steel finish
9) PARTS DELIVERED
11) Filter Seal ½
12) Straight stop valve G1/2
13) Angle stop valve G1/2
14) Socket flow limiter G1/2
15) Flat seal G1/2
16) Flow regulator
17) Plug
18) Screw VBA TC 4x40 + washer
19) Operation of the PLP panel
The shower panel only works if connected to the control unit.
- Lightly touching the button starts the flow of the shower for a duration of 30 seconds (factory setting)
- Start/Stop function: The user can always stop the flow by pressing the button again
- The time flow and all parameters are defined on page 10
Commissioning
· Before commissioning, activate several times to evacuate the air, and adjust the angle of the jet.
Wintering
In case of installation in a freezing zone, the panel must be removed in winter.
20) When switching on the panel, wait for at least 10 s before lightly touching the button.
21) Preparation
22) INSTALLATION
23) Drain the pipes
24) Equipotential bonding: Connect wire to an open lug D4 (not provided) to be inserted below this screw.
25) Hydraulic Connection
26) Top inlet
27) Hot Water Side
28) Rear inlet
29) Connecting to the box
The panel must be connected to its anti-legionella control box
30) D1: Shower 1 ; D10: Shower 10
31) Red
32) Blue
33) Orange
34) White
35) The marking colours on the connecting straps must be connected to the corresponding terminals of the lockable box. The use
of a 4x1.5mm² cable is recommended.
36) Replacing the solenoid valves:
- Normally Closed N-C Part no. 90983
- Normally Open N-O Part no. 90984
37) -Turn off the panel
-Turn off the water
38) ADJUSTMENT AND MAINTENANCE OF THE THERMOSTATIC CARTRIDGE
The Mixing valve allows the user to select the temperature of the lukewarm water, between
the cold water temperature and the lukewarm temperature preset at 38°C.
39) MODIFICATION OF THE MAX OPERATING TEMPERATURE
40) + Hot
41) + Cold
42) On delivery black line or point Ø1.5 vertically aligned
43) Red ring
44) -Rotate the centre spindle according to the desired temperature: 1 notch = 2°C
-Refit the lever keeping the mark (A) vertical