Fireplace, Canopy And Gas Line Installation; Canopy Installation - Monessen Hearth LCUF32CR-B Installation & Owner's Manual

Vent free firebox
Table of Contents

Advertisement

7

Fireplace, Canopy and Gas Line Installation

SECURING AND LEVELING THE APPLIANCE
1. Bend out the nailing flanges located on each side of the
firebox.
2. Slide the firebox into prepared framing or position firebox
in its final position and frame later.
3. Level the firebox by checking the top edge of the firebox.
Shim if necessary.
4. Anchor firebox to the side framing members using 8d
nails or other suitable fasteners. Figure 7.1
5. The canopy must be installed for safe operation of the
firebox. See instructions below.
Nail Sides Through Nailing Flanges
Figure 7.1 Location of Nailing Flanges

CANOPY INSTALLATION

A canopy is furnished with each firebox and MUST be in-
stalled for safe operation.
1. Locate three (3) screws at the front edge of face (one
at each end, and one in the center.)
2. Loosen screws slightly, slide canopy slots against
screws and tighten in place. Figure 7.2
14
Monessen • LCUF32/36/42 Installation and Operating Manual • 4607-900 • Rev D • 3/21
Front Face
Screws
Figure 7.2 Canopy Installation
WARNING!
The firebox canopy must not be modified or
replaced with a canopy that may be provided
with the vent free decorative room heater.
WARNING!
Close fireplace screen panel before operating a
decorative type vent free room heater.
Canopy

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lcuf36cr-bLcuf42cr-b

Table of Contents