Network Wiring Connections - LG-Nortel iPECS ES-3026 Installation Manual

Managed fe switch; managed fe poe switch
Table of Contents

Advertisement

| Making Network Connections
C
4
HAPTER
Twisted-Pair Devices
ES-3026/3026P
N
W
ETWORK
IRING
C
ONNECTIONS
Avoid using flow control on a port connected to a hub unless it is
N
:
OTE
actually required to solve a problem. Otherwise back pressure jamming
signals may degrade overall performance for the segment connected to the
hub.
As each connection is made, the Link LED (on the switch)
3.
corresponding to each port will turn on (green or amber) to indicate
that the connection is valid.
Today, the punch-down block is an integral part of many of the newer
equipment racks. Actually it is a part of the patch panel. Instructions for
making connections in the wiring closet with this type of equipment
follows.
Attach one end of a patch cable to an available port on the switch, and
1.
the other end to the patch panel.
If not already in place, attach one end of a cable segment to the back
2.
of the patch panel where the punch-down block is located, and the
other end to a modular wall outlet.
Label the cables to simplify future troubleshooting. See
3.
and Connection Records" on page
– 38 –
"Cable Labeling
42.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipecs es-3026p

Table of Contents