| Installing the Switch
C
3
HAPTER
Equipment Checklist
ES-3026/3026P
E
C
QUIPMENT
HECKLIST
Electrical surge suppression
◆
Separation of electrical wires (switch related or other) and
◆
electromagnetic fields from data based network wiring
Safe connections with no damaged cables, connectors or shields
◆
Figure 11: RJ-45 Connections
RJ-45 Connector
After unpacking this switch, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.
Managed 26-Port FE Switch (ES-3026), or
◆
Managed 26-Port FE PoE Switch (ES-3026P)
RJ-45 to RS232 console cable
◆
Four adhesive foot pads
◆
Grounding screw
◆
◆
Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
Power Cord
◆
◆
Quick Installation Guide
Manual CD
◆
– 28 –