Optional Rack-Mounting Equipment; Mounting; Rack Mounting; Figure 12: Grounding - LG-Nortel iPECS ES-3026 Installation Manual

Managed fe switch; managed fe poe switch
Table of Contents

Advertisement

O
R
-M
PTIONAL
ACK
OUNTING
M
OUNTING
R
M
ACK
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following
equipment available:
Four mounting screws for each device you plan to install in a rack—
these are not included
A screwdriver (Phillips or flathead, depending on the type of screws
used)
The switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the rack-
environment temperature is within the specified operating temperature
range.
("Physical Characteristics" on page
Mechanical Loading: Do not place any equipment on top of the rack-
mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.

Figure 12: Grounding

– 29 –
| Installing the Switch
C
3
HAPTER

Optional Rack-Mounting Equipment

51.)
1.
Attach an insulated grounding
wire, with a metal screw, to
the marked grounding point.
ES-3026/3026P
AC 100-240V, 50-60Hz, 3A
2.
Terminate the wire in an
earthed grounding point.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipecs es-3026p

Table of Contents