System Setup and Operation

System Setup and Operation

System setup

Description
The drive provides the +24 V power supply to the operator panel via the RJ45 connection.
If the drive is not used for power supply, then external power supply is possible. When the
connection has been set up, the system is ready to operate.
Cable splitters are ordered separately.
For a list of the parameters and setup, see the Installation, Operation, and Maintenance
manual for the drive.
Configuration alternatives
1.
2.
Figure 1: One operator panel with one drive
1.
2.
3.
Figure 2: One operator panel with up to 63 drives
8
1
Operator panel
Drive
1
3
Operator panel
Drive
Cable splitter
EOP1 Operator Panel Installation, Operation, and Maintenance manual
2
2
2