Chapter 3: Site Preparations; Site Selection; Cabinet Placement - Dell EMC PowerSwitch Z9100–ON Installation Manual

Hide thumbs Also See for EMC PowerSwitch Z9100–ON:
Table of Contents

Advertisement

The Z9100–ON is suitable for installation as part of a common bond network (CBN).
You can install the switch in:
● Network telecommunication facilities
● Data centers
● Other locations where the National Electric Code (NEC) applies
For more information about Z9100–ON specifications, see Specifications.
NOTE:
Install the Z9100–ON switch into a rack or cabinet before installing the components.
Topics:

Site selection

Cabinet placement

Rack mounting
Z9100–ON ground
Fans and airflow
Power
Storing components
Site selection
Install Dell EMC equipment in restricted access areas.
A restricted access area is one in which service personnel can only gain access using a special tool, lock, key or other means of
security. The authority responsible for the location must control the site access.
Ensure that the area where you install your Z9100–ON switch meets the following safety requirements:
● Near an adequate power source. Connect the switch to the appropriate branch circuit protection as defined by your local
electrical codes.
● Environmental—switch location—temperature range is from 32° to 113°F (from 0° to 45°C).
● Ambient—switch operating—temperature range is from 10° to 35°C (from 50° to 95°F).
● Relative humidity is from 5 to 85 percent noncondensing.
● In a dry, clean, well-ventilated, and temperature-controlled room, away from heat sources such as hot air vents or direct
sunlight.
● Away from sources of severe electromagnetic noise.
● Positioned in a rack or cabinet, or on a desktop with adequate space in the front, back, and sides for proper ventilation and
access.
● Install the switch in information technology rooms in accordance with Article 645 of the National Electrical Code and NFPA
75.
Cabinet placement
Install the Z9100–ON only in indoor cabinets designed for use in a controlled environment.
Do not install the Z9100–ON in outside cabinets. For cabinet placement requirements, see
The cabinet must meet minimum size requirements. Airflow must be in accordance with the Electronic Industries Alliance (EIA)
standard. Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.