Rates And Effi Ciencies; Installation Overview - Napoleon Riverside Series Installation And Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

1.2
rates and effi ciencies
For your satisfaction, this appliance has been test-fi red to assure its operation and quality.
Altitude (FT)
Max. Input (BTU/HR)
Min. Inlet Gas Supply Pressure
Max. Inlet Gas Supply Pressure
Manifold Pressure (Under Flow Conditions)
1.3

installation overview

10
1. Determine the fi nal location of the appliance (see "location" section).
2. Determine the most appropriate gas inlet location (see "gas inlet location" section).
3. Plan out appliance enclosure, framing, fronts, accessories, etc.
4. Install rough framing (see "framing" section).
5. Install all electrical wirings (refer to "electrical information" section).
6. Install gas lines (see "gas installation" section).
7. Test appliance.
8. Install nailing tabs (see "nailing tab installation" section).
9. Complete framing (see "framing" section).
10. Complete fi nishing (see "fi nishing" section).
6
5
9
4
8
7
general information
Natural Gas
4.5" (11mb) w.c.
13" (32mb) w.c.
3.5" (9mb) w.c.
1
3
2
Propane
0-4,500
40,000
11" (27mb) w.c.
10" (25mb) w.c.
W415-2978 / 02.16.21
EN
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gss36cfneGss36cfpe

Table of Contents