Nuaire Group LPXBOXAC-2 Installation And Maintenance

Mechanical ventilation with heat recovery

Advertisement

Quick Links

1.0 Introduction

The Nuaire LPXBOXAC-2 unit is designed to provide
mechanical supply and extract ventilation with heat
recovery.
The unit is fitted with two fans with independant adjustable
speed control. A plate heat-exchange constructed from
aluminium is used to provide up to 66% heat recovery.
Figure 1.
Supply
Discharge
Intake
Access covers on underside.

2.0 Installation

nstallation must be carried out by competent personnel
I
conforming to all statutory and governing regulations
including the current wiring and CDM regulations.
Special attention must be paid to the size and weight of the
unit and the handling method to locate the unit in situ.
The unit is designed to be ceiling mounted in the horizontal
plane with access panel and condensate drain pipe on either
side.
The fan must be fitted indoors, away from any direct
sources of heat, water spray or moisture generation.
O
Temperature range -5
C to 40
Please note a clear working space is required around
the installed unit to allow the cover to be removed and
provide sufficient access for maintenance such as filter
change.
The fan is designed to be wired direct to the mains supply
through a fused spur isolator (by others).
With the unit fixed in position and working from underneath
the installation bring the mains wiring through the chosen
rubber cable entry grommet at the new connection box.
Additional grommeted holes are provided to allow additional
wiring to each blower.
Nuaire Limited Western Industrial Estate Caerphilly United Kingdom CF83 1NA
T: 029 2085 8400 F: 029 2085 8444 E: info@nuaire.co.uk W: www.nuaire.co.uk
LPXBOXAC-2
Mechanical Ventilation with Heat Recovery
Extraction
Extraction
Intake
O
C.
Installation of the unit
The integral mounting bracket supplied with the unit can be
offered up to a chosen mounting position, the fixing points
marked through and the bracket installed with 4 screws
(by others).
The unit can then be offered into position, locating the
tongues on the mounting bracket into the slots in the hold-
ing supports on either side of the unit. When positioned fix
the unit to the mounting bracket with M5 screws.
Figure 2.
Fixing screw holes for
M5 screws in the
mounting bracket.
Holding supports
either side of unit to allow
alternative mounting option.
Figure 3.
Cut through the
Damper can be
acoustic foam round
swivelled on the
the circumference of
2 body casing
the damper.
hinges.
Various damper/inlet spigot positions can be utilised as
required to suit the system ductwork and extract grilles.
To reduce air leakage, spigots should be sealed to the unit
by silicone sealant or similar (by others).
All inlet dampers are 'closed' as knockouts when delivered
but can be opened using a sharp knife. (See figure 3).
After the spigot has been fixed adjust the damper with a
screwdriver. (See figure 4).
See figure 5 for spigot location and sizes.
The condensate drain must be connected via a trap into
either a suitable waste water system or to the outside of
the building. Ensure the pipe from the condensate drain falls
away from the unit.
1
The EMC Directive
2004/108/EC
The Low Voltage
directive
2006/95/EC
Figure 4.
When spigot is in
position, damper can
be adjusted using a
screwdriver.
16. 06. 15. Leaflet Number 671391

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LPXBOXAC-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nuaire Group LPXBOXAC-2

  • Page 1 1.0 Introduction Installation of the unit The integral mounting bracket supplied with the unit can be The Nuaire LPXBOXAC-2 unit is designed to provide offered up to a chosen mounting position, the fixing points mechanical supply and extract ventilation with heat marked through and the bracket installed with 4 screws recovery.
  • Page 2 Installation and Maintenance LPXBOXAC-2 Mechanical Ventilation with Heat Recovery 2.0 Dimensions Figure 5. Dimensions in mm. Side view (view from B) End view (view from A) Plan view (view from top Plan view (view from underside with covers removed) with covers removed)
  • Page 3 Installation and Maintenance LPXBOXAC-2 Mechanical Ventilation with Heat Recovery 3.0 Electrical Wiring Unit must not be switched off, product is designed to run continuously. Isolation - Before commencing work make sure that the unit, switched live and Nuaire control are electrically isolated from the mains supply.
  • Page 4 Installation and Maintenance LPXBOXAC-2 Mechanical Ventilation with Heat Recovery 11.0 Connection of Drain Pipe Seal the internal perimeter between the drain pipe and “O” ring with silicone to prevent air leakage. The unit needs a drain pipe to function correctly.
  • Page 5 1) C. Biggs Technical Director 20. 07. 07 EC Machinery Directive. Designation of machinery: LPXBOXAC-2 2) A. Jones Manufacturing Director 20. 07. 07 Machinery Types: Mechanical Ventilation with...

Table of Contents