Download Print this page

Vestil HDC-900 Owner's Manual page 11

Hydraulic drum crusher/compactor
Hide thumbs Also See for HDC-900:

Advertisement

Procedures for adjusting hydraulic valves and pressure switches:
1. Install pressure gauges in ports GA and UL GA (see FIGS. 6 & 7 respectively on p. 7D):
[NOTE: Hose fittings and adaptors might be necessary to connect the gauges to these ports.]
a. Remove the cap plugs from port GA and install a 3000psi gauge into the port. The port is located
under the directional valve; then
b. Remove the cap plug from port UL-GA and install a 3000psi gauge into the port, which is located
under the sequence valve (pointed towards the motor).
2. Prepare the pressure switches:
a. Using a standard (flathead) screw-driver, loosen the set-screws through the knurled knobs on
both of the pressure switches (see FIG. 6, p. 7B); then
b. Turn the knurled ring of each pressure switch clockwise until they can turn no farther.
3. Turn the adjustment hex flats on the relief valve (See FIG. 7 on p. 7D; labeled RV) out all the way, by
turning it counterclockwise.
4. Turn the selector-switch on the control box to "COMPACT".
5. Press the cycle start button on the control box.
a. Hold the button until the motor engages.
b. While the motor operates, the hydraulic cylinder extends and the platen descends towards the
bottom of the enclosure.
6. Adjust the unload valve:
a. When the cylinder is fully extended and while the motor continues to run, adjust the unload valve
(in port SV) until the UL GA pressure gauge reads 1000 psi. Typically, adjustment requires
turning the valve clockwise rather than counterclockwise.
7. Adjust the relief valve:
a. With the motor running, observe the reading on the gauge connected to the GA port.
b. Begin turning the adjustment hex of the relief-valve ("RV") clockwise. [Note: As pressure
approaches 1000 psi, you will hear a change in sound as the unload valve--adjusted in step 6--
shifts into the unloaded position.]
c. Continue to increase the RV setting until the GA gauge displays 1500 psi.
8. Adjust the upper pressure switch (in port PS2):
a. With the power unit now adjusted and operating at 1500 psi pressure, decrease the setting on
PS2;
b. Rotate the knurled knob counterclockwise until it clicks. The click indicates that the directional
valve shifted. Consequently, the cylinder will retract and lift the platen to the raised position and
the power unit will turn off.
9. Adjust the lower pressure switch (PS1):
a. Turn the selector switch on the control box to "CRUSH".
b. Press the cycle start button and hold it until the motor engages.
c. While the power unit runs,
i. Increase the RV valve setting until the gauge displays 3000 psi.
ii. Turn the knurled knob on the pressure switch in port PS1 (lower pressure switch)
iii. Turn the knob counter-clockwise an additional 1/8 turn.
10. Return the crusher to service:
a. Run the crusher through a complete cycle in each mode (COMPACT and CRUSH) to confirm
that the machine is functioning normally.
b. Remove the pressure gauges and reinstall the cap plugs into ports GA and UL GA.
c. Tighten the set screws to fix the positions of the knurled knobs of PS1 and PS2.
Page 7D
counter-clockwise until it clicks. The click indicates that the switch is open.
Simultaneously, the valve shifts and the platen will rise.

Advertisement

loading

This manual is also suitable for:

Hdc-905