11.0 Overall Verification

11.1
M
C
AIN
ONTROLS
This procedure allows the installer to verify that all modes of operation are fully functional.
During the verification of a main control, make sure that all optional remote controls are inactive.
BASIC (Can.) / VT1W (U.S.)
Set the slider
switch to
1
Off
2
Off
3
Min.
4
Min.
5
Max.
6
Max.
ELECTRO (Can.) / VT2W (U.S.)
Set air supply
Set condensation control
control to
1
Off
maximum counterclockwise
2
Off
maximum clockwise
3
Min.
maximum counterclockwise
4
Min.
maximum clockwise
5
Max.
maximum counterclockwise
6
Max.
maximum clockwise
7
Intermittent
maximum counterclockwise
8
Intermittent
maximum clockwise
HUMIDITY MAIN CONTROL
Turn dial to maximum clockwise position.
Results expected: Motor speed changes to high.
NOTE: Appearance may vary.
(6 different control scenarios to be tested)
Set condensation control
dial to
maximum counterclockwise
maximum clockwise
maximum counterclockwise
maximum clockwise
maximum counterclockwise
maximum clockwise
(8 different control scenarios to be tested)
Results expected
Fan
dial to
speed
off
off
low
high
high
high
off 40 min off 40 min
low 20 min on 20 min
high
CONDENSATI0N CONTROL
Results expected
fan speed
motor off
motor off
low speed
AIR SUPPLY CONTRO
high speed
high speed
high speed
VC0027
CONDENSATI0N CONTROL
Exchange Max speed
indicator
indicator
(A)
(B)
off
off
off
off
on
off
on
on
on
off
on
on
AIR SUPPLY CONTRO
off
off
on
on
VC0028
20%
HUMIDITY
CONTROL
25%
VC0031
31
-20 C
-4
41 F
L
LY CONTRO
L
OFF
MIN.
A A IR R
I
IR
EXCHANGE
CH H A
MAX.
C
C
-4 F
-5
41 F
CONDENSATION CONTROL
MAXIMUM SPEED
AIR EXCHANGE IN PROGRESS
L
LY CONTRO
L
MIN.
MAX.
20 MI
M N.
N
N.
40 MIN.
ON
ON
CONTINUOUS
CONTINUOUS
INTERMITTENT
INTERMITTENT T
A
B
70%
60%
30%
50%
40%
M
OF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents