Assemble The Guide Bar And The Chain - GreenWorks 20222 Operator's Manual

Table of Contents

Advertisement

Available languages

Available languages

EN
The machine comes from the factory without bar and chain
oil.
7
1. Loosen and remove the cap (2) from the oil tank.
2. Put the oil into the oil tank.
3. Monitor the oil indicator (7) to make sure that no dirt gets
into the oil tank while you add the oil.
4. Put the oil cap on.
5. Tighten the oil cap.
6. The whole oil tank will last for approximately 20- 40
minutes.
Do not use dirty, used or contaminated oil. Damage can
occur to the bar or chain.
9.3
ASSEMBLE THE GUIDE BAR AND
THE CHAIN
1. Loosen the chain cover by turning the chain cover knob
(11) counterclockwise.
13
2. Remove the chain cover.
3. Put the chain drive links (21) into the bar groove (20).
NOTE
2
IMPORTANT
11
English
17
4. Put the chain cutters (22) in the direction of the chain
operation.
5. Put the chain in position and make sure that the loop is
behind the guide bar.
6. Hold the chain and bar.
7. Put the chain loop around the sprocket (17).
8. Make sure the chain tension pin hole (15) on the guide
bar fits correctly with the bolt (16).
9. Install the chain cover.
10. Tighten the chain. Refer to Adjust the chain tension.
11. Tighten the chain cover knob (13) when the chain is
correctly tensioned.
If you start the chain saw with a new chain, have a test for
2-3 minutes. A new chain gets longer after the first use,
examine the tension and tighten the chain if necessary.
8
16
15
22
21
20
19
18
NOTE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csa801

Table of Contents