Installation - Miele PDR 914 HP Quick Start Manual

Commercial tumble dryers
Table of Contents

Advertisement

Available languages
  • EN

Available languages

Then firmly screw on the tumble dryer lid.
a
Tumble dryer

Installation

Place the heat-pump dryer on a totally level, secure and horizontal surface that is able to
withstand the specified floor load.
The floor load created by the heat-pump dryer is concentrated and transferred to the in-
stallation footprint via the machine feet. A base is not required. However, an uneven floor
surface must be compensated for.
Place the heat-pump dryer as close as possible to a cold water connection so that you
can easily clean the heat exchangers with a hose, if required (water pressure up to a
maximum of 4 bar is permitted).
y
906 mm
b
Heat-pump
x
1400 mm
z
PDR 914: 1210 mm / PDR 918: 1413
mm / PDR 922: 1522 mm
en - Installation
153

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 918 hpPdr 922 hp

Table of Contents