Installation Of The Vf Secondary Vessel; Assembly Of The Add-On Parts For Vg And Vf Vessels - Reflex variomat 1 Assembly, Operating, And Maintenance Instructions

Pressure-maintaining station
Table of Contents

Advertisement

reflex 'variomat'
Assembly

Installation of the VF secondary vessel

The hose set
enclosed with the VF secondary vessel must be assembled
3
at the outlet of the VG basic vessel intended for this purpose and individually
connected to the piping provided on site.
Only two R1 connection nipples are available on the flange of the VG basic
vessels above 1000 l Ø 1000 mm. In this case the hose set of the VF secondary
vessel has to be assembled at the connection
(Diagram on p. 7.)
Assembly of the add-on parts for VG
and VF vessels
Dipstick-tube degassing, venting of the diaphragm compartment
(compensating bend)
The add-on pieces are affixed to the vessel foot and packed in a PE bag.
With VG and VF vessels up to Ø 740 mm:
– Evacuation device with ventilation protection (26)
– Reducing sleeve Rp ½ x Rp ⅜
With VG and VF vessels above Ø 1000 mm:
– Evacuation device with ventilation protection (26)
– Reducing sleeve R 1 x Rp ⅜
8
These parts must be sealed, assembled and mounted in the middle vessel
connection on the vessel. The plastic cap of the ventilation protection must be
removed.
Assemble the supplied compensating bend (28) with the clamping ring connection
at the vessel connector for evacuation and ventilation of the diaphragm
compartment.
Attention! The compensating bend (28) must not be sealed! A draining facility
must be provided on site, for example via a funnel.
→ see also diagram on p. 7
using the T-piece.
2
Assemble
without cap!
26
Exploded
view
28
on site
Vessel up to ∅ 740 mm
Assemble
without cap!
26
Exploded
view
Vessel above ∅ 1000 mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents