Download Print this page

AquaScape AquaBasin Small Step By Step Installation Instructions page 4

Advertisement

Installing a Decorative Spitter
1) The Small AquaBasin
Connect the tubing to the Ultra
the AquaBasin
and then place the pump and plumbing inside the AquaBasin
can be run out the notch on the side of the AquaBasin
2) The Small AquaBasin
in each corner on top of the AquaBasin
you the additional option of placing a decorative
piece on one of the corners and running the tubing
inside the basin rather than through the center
plumbing port. Depending what size tubing is being
used, a ½" or ¾" hole saw drill bit will be needed to
drill out the hole(s). (See the drawing on the right.)
3) Next, place the spitter where desired and connect
the tubing to the barb fitting using the supplied hose
clamp from the AquaBasin
#98136, #98138, or #98463 sold separately).
(*Note – It is recommended to adjust the water flow of the pump by adjusting the ball
valve before finally placing the decorative spitter.) (Fig. 9)
4) Now that everything is in place, you can finish covering the top with your choice of gravel.
(Fig. 10)
4
is designed with one removable grate for easy pump access.
Pump and ball valve using the plumbing supplies from
Ultra
Pump Kit (items #98136, #98138, or #98463 sold separately)
is designed with a drill point
. This gives
Ultra
Pump Kit (items
Fig. 9
. The cord from the pump
.
Center
Optional
Plumbing Port
4 Drill Points
Fig. 10

Advertisement

loading

This manual is also suitable for:

98525