Trane PolyTherm ARTC-SVX005A-EN Installation, Operation And Maintenance Manual page 19

Simultaneous chiller/heater
Table of Contents

Advertisement

Table 2.
Initial startup readiness checklist (continued)
Check the box if source/sink chilled water lines have been leak tested according to prestartup instructions.
Check the box if source/sink reservoir (if included) is at operating level with correct water/glycol mixture.
Check the box if high voltage wiring is installed, tested, and functional.
Check the box if all water, refrigeration, electrical, and control connections between chiller/heater modules are
completed.
Check the box if all control wiring between modular chiller/heaters is installed, tested, and functional.
Check the box if control wiring is complete, including any remote interface panel or special-purpose module wiring.
Check the box if all responsible installing contractors and sub-contractors have been notified to have
representatives available on site to provide technical support for the initial start-up procedure.
Check the box if full load will be available for chiller/heater on the initial start-up date.
Touchscreen Interface Panel: Record version and date of the software loaded into the touchscreen interface panel:
Version: ____________________________________ Date: ________________
Note: To view the software version, from the home screen, press the software button on the System Control screen.
ARTC-SVX005A-EN
Startup Readiness Dimension
Pre-Installation
19