Read this entire installation manual to ensure proper installation. When finished with the
Installation
installation, file this manual with the owner or maintenance department. Compliance and
conformity to local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
•
discarding packaging material. If any parts are missing, do not begin installation until
•
•
IS
T H
•
E
S ID
U P
you obtain the missing parts.
Make sure that all water supply lines have been flushed and then completely turned off
before beginning installation. Debris in supply lines can cause valves to malfunction.
Product warranties may be found under "Products" on our web site at
www.bradleycorp.com.
215-1780 Rev. B; ECN 13-03-009
© 2013 Bradley
Page 1 of 2 7/2/2013
Installation
S24-210
Ligature Resistant Showerhead
IMPORTANT!
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817
bradleycorp.com
Need help?
Do you have a question about the S24-210 and is the answer not in the manual?
Questions and answers