24"
24"
24"
24"
1 . M O V I N G T H E B I K E
•
Tilt the bike forward onto the wheels. Lift the rear stabiliser while a
second person holds the handlebars.
•
Carefully roll the bike to the new location. Avoid uneven surfaces.
•
If you need to lift the bike, bend at the knees and lift the front and
rear stabilisers.
2 . B I K E P L A C E M E N T
Place the bike mat in the desired position.
•
Ensure that the monitor cable is out of the way to prevent
•
damaging it during installation.
Place the bike on a solid, level and horizontal surface.
•
Allow a clearance of 24" (60 cm) on each side of the bike.
•
3 . AT TA C H T O U C H S C R E E N
•
Remove the touchscreen from the box and lay it face down on
a towel or a soft surface.
•
Remove the square panel from the back of the touchscreen,
then line the touchscreen up with the monitor mount.
•
Using a Phillips head screwdriver and the four screws from the
touchscreen box, attach the touchscreen. After which return
the square panel to the back of the touchscreen.
•
Locate the monitor cable and plug the free end into the power
and data ports on the back of the touchscreen.
WA R N I N G
The monitor cable is the one coming from the flywheel
area. Do not plug the bike's power cable directly into the touchscreen.