Download Print this page

Advertisement

Quick Links

FORTE UP2
FORTE UP2, Installation, use and maintenance
UK

Advertisement

loading
Need help?

Need help?

Do you have a question about the FORTE UP2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for EdilKamin FORTE UP2

  • Page 1 FORTE UP2 FORTE UP2, Installation, use and maintenance...
  • Page 2 - All images are for illustration purposes only; actual products may vary. The undersigned EDILKAMIN S.p.a. with head office headquarters at Via Vincenzo Monti 47 - 20123 Milan - Italy - tax code and VAT no. 00192220192...
  • Page 3 THE TECHNOLOGY • AVAILABLE VERSIONS N natural convection V forced ventilation • CLEAN COMBUSTION SYSTEM: S.C.P. Ensures high thermal efficiency and clean emissions The system combines an innovative air distribution method of primary combustion (A) and post-combustion (B) the primary combustion air is fed into the firebox and is uniformly distributed over the embers.
  • Page 4: Specifications

    THE TECHNOLOGY • AIR INTAKE MECHANISM sensor to be placed on hot heating air damper control the air is drawn in from the outside and mixed with the air air outlet channel (see p. fig. O) inside using a new wire controlled mechanism recessed in the bottom front panel of the firebox.
  • Page 5: Installation Instructions

    INSTALLATION INSTRUCTIONS Important warnings Vorwort Floor opposite the hearth • The FORTE UP2 hearths must be Floors made with fuelling materials As well as that indicated in the pre- installed keeping to the following must be protected by a sufficiently...
  • Page 6 The smoke channel must be made with - service only one hearth (chimney or Edilkamin will not be held responsible stiff steel or ceramic pipes, flexible stove). for costs deriving from demolition or metal or fibre-cement pipes are not allo-...
  • Page 7 INSTALLATION INSTRUCTIONS - build the frame with the fitting for Installing the hot air circulation system outlet "B3" into the wall of the room jacket of the fireplace absolutely must requiring heating be conducted into the indoor environ- - connect the two aluminium pipes to ment.
  • Page 8 INSTALLATION INSTRUCTIONS External air inlet (figures E-F-G) Transporting the fireplace Cleaning the glass (fig. L) It is absolutely necessary, without In order to facilitate transportation, the - To clean the glass you can open the fireplace can be made lighter by remo- exception, to build a connection to the hinged door to the firebox by outside with a cross-section of 300 cm²...
  • Page 9 INSTALLATION INSTRUCTIONS - ensure that the electrical wires do not • the first side panel Electric cable connections (fig. N) • front Panel In order to connect the electrical cables have any areas of contact with the - secure outlets (22) in the top part of to the control unit inside the mecha- prefabricated appliance and the smoke the frames after making a hole of...
  • Page 10 INSTALLATION INSTRUCTIONS Placement of damper control air Fan 12 then pushes the air through the Buttons intake mechanism air jacket of the fireplace, through ope- On/Standby to the right = Open ning 4f, where it is heated and then, with the fireplace on adjust the outdoor Automatic or manual through the aluminium pipes, exits air mixed with indoor air.
  • Page 11: Use Instructions

    Only use burning wood with minimum two installed The FORTE UP2 hearth is able to work years seasoning in an airy and dry room. In require a sufficient air flow, so that this cri-...
  • Page 12 Sequenza montaggio “GHISE FOCOLARE” • before inserting the cast iron hearth plates, the ceiling (2d), pre-mounted in the thermo fireplace, must be removed by loosening the two screws, then proceed with installation. • front left side (2c) • rear left side (2b) •...
  • Page 13 Sequência de montagem das “PAREDES INTERNAS DA LAREIRA” • antes de proceder com a inserção e a montagem das paredes internas é necessário desmontar o painel superior (2d) previamente montado desparafusando os dois parafusos; proceder, a seguir, com as operações: •...
  • Page 14 n° 2 viti 2 screws 2 tornillos 2 parafusos 2 βίδες 2 винта...
  • Page 16 w w w . e d i l k a m i n . c o m -GB 0 .1 /A...