GE IM-6D Owner's Manual & Installation Instructions page 42

Icemaker accessory kit
Table of Contents

Advertisement

Available languages

Available languages

WATER VALVE ASSEMBLY INSTALLATION INSTRUCTIONS
INSTALL WATER LINE CLAMP
4
WARNING
Attach tubing clamp using existing hole only. DO
NOT drill into the refrigerator.
Attach the metal water line clamp
the kit through the clamp
the back of the cabinet.
be used for the tubing from the water valve up to
the icemaker.
Small indent for water
line clamp installation
ROUTE AND ATTACH THE
5
PLASTIC WATER LINE
Fasten the plastic water tube to the back of the
spacing the fasteners as shown to take up slack in
the tube.
42
Installation Instructions
U , V or W (Cont.)
ELECTRIC SHOCK
HAZARD
screw
7
17
Adhesive-backed
fasteners for water tube
WATER VALVE INSTALLED
6
connection to the home water supply. After water
line installation is completed, set the icemaker
power switch to ON.
The icemaking cycle will not begin until the
icemaker and freezer compartment reach
operating temperature, then icemaking will
begin automatically.
REINSTALL THE COVER
7
Reinstall the compressor compartment access
removed previously to reattach the cover to
the back of the refrigerator case. This must be
reinstalled for your refrigerator to function properly.
49-60704-2

Advertisement

Table of Contents
loading

Table of Contents