General Installation; Removing The Packaging And Checking Individual Parts - Siemens SCD 1815-E Operating Instruction

Table of Contents

Advertisement

Available languages

Available languages

2. General Installation

Preparations for installing the LCD-monitor include the following points:
• Removal of all packaging
• Checking of components for damage
• Comparison of components received with those on the delivery note
• Connection to the computer system and power supply
• Building into your system, note technical and ergonomic recommendations
2.1.

Removing the Packaging and Checking Individual Parts

After unpacking all the delivered components, they should be checked for completeness and
for possible transport damage (visual inspection). If any deficiencies are found then please
contact the service department given on the delivery note. Have the delivery note number,
serial number and a description of the deficiency to hand.
The original packaging should be kept for future transportation.
LCD-Monitor SCD 1815-E
page 35 / 52
Operating Instruction
DOC-Nr.: B30055DE6.doc

Advertisement

Chapters

Table of Contents
loading

Table of Contents