Vitoligno 300-C Operating
Commissioning
Regular Service Inspection
Commissioning and adjusting the control unit to local
conditions and the structural characteristics of the
building must be carried out by your heating contractor.
As the user of new combustion equipment, you may be
obliged to notify your local heating contractor of the
installation [check local regulations]. Your local heating
contractor [where applicable] will also provide you with
information on additional activities concerning your
combustion equipment (such as regular testing, cleaning,
etc.).
Refer to the Installation and Service Instructions.
Your heating contractor must prepare the boiler for
this test.
Notify your heating contractor approx. 2 weeks prior
to the next service inspection being due.
Ensure that suitable fuel in line with these operating
instructions is available.
Refer to the Installation and Service Instructions.