Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
1. Filling the heating system................................................................................................. 10
•
2. Venting the boiler at the safety equipment block (accessories).................................... 11
•
3. Venting the heating system
•
•
4. Shutting down the system
•
•
5. Draining the heating system (if required)........................................................................ 12
•
•
6. Opening the boiler door..................................................................................................... 12
•
•
7. Cleaning the heating surfaces.......................................................................................... 13
•
•
8. Checking the gaskets and thermal insulation sections................................................. 14
•
9. Fitting the boiler door........................................................................................................ 14
•
•
10. Separating the neutralising system or active charcoal filter (if installed) from the
boiler and connecting the drain hose.............................................................................. 15
•
•
11. Checking the neutralising system (if installed)............................................................... 15
•
•
12. Checking the active charcoal filter (if installed).............................................................. 15
•
•
13. Checking the connection on the flue gas side for leaks................................................ 16
•
•
14. Cleaning the condensate drain pipe and trap and reconnecting to the drainage
system................................................................................................................................. 16
•
15. Filling the trap and neutralising system (accessories) with water................................ 16
•
•
•
16. Checking connections on the heating water and DHW sides and the sensor well for
leaks
•
•
•
17. Checking the function of the safety equipment
•
•
18. Checking the expansion vessel and system pressure................................................... 17
•
•
•
19. Checking the thermal insulation for firm seating
•
•
20. Checking the mixer for ease of operation and leaks...................................................... 17
•
•
•
21. Checking the ventilation air connection to the burner (if installed).............................. 18
•
•
•
22. Adjusting the burner.......................................................................................................... 18
•
23. Instructing the system user.............................................................................................. 18
Commissioning, inspection, maintenance
Page
9