COMMISSIONING

WARNING Electrocution
Commissioning may only be carried out by a qualified contractor in
accordance with safety regulations.
IInitial start-up
1. Ensure the unit has been flushed and is full of water.
2. Switch on power at the fused spur.
3. Turn the temperature setting knob to the desired temperature.
4. Check the entire hydraulic installation for tightness.
5. Allow the unit to heat up.
6. Open hot tap and check temperature of water is at desired
temperature.
Note
If you fail to follow the correct sequence (first water, then power),
the high limit safety cut-out will trip.
WARNING
This appliance is not intended for use by persons (including
children) with reduced physical, sensory or mental capabilities, or
lack of experience and knowledge.
Children should be supervised by a person responsible for their
safety to ensure that they do not play with the appliance.
Appliance handover
Explain the functions of the appliance to the user. Show the user how to operate
the appliance.
Make the user aware of potential dangers, especially the risk of scalding.
Hand over these instructions and, if applicable, the instructions for any
accessories.