Download Print this page

Crown GS-30 Installation & Operation Manual page 8

Gas skillets

Advertisement

I
NSTALLATION
L
A
eveling and
nchoring
1. Set the appliance in place and level left to right and front-to-back using spirit level.
2. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet.
3. Remove appliance and drill holes in locations marked on floor and insert proper anchoring devices (not supplied).
4. Set unit back in position and re-level left to right and front to back.
5. Bolt and anchor appliance securely to the floor.
6. Seal bolts and flanged feet with Silastic or equivalent compound.
Do not connect the appliance to the electrical supply until after the gas connection has been made.
Gas Connections
All gas supply connections and any pipe joint compound used must be resistant to the action of propane gases.
The gas inlet is located under the control panel on the left-hand side.
Connect gas supply to the tilting braising pan. The gas supply line must be at least the equivalent of 3/4" iron pipe with an
incoming pressure of approximately 7" W.C. (Water Column) for natural gas or 11" W.C. (Water Column) for propane gas.
Make sure the pipes are clean and free of obstructions, dirt and piping compound.
Codes require that a gas shutoff valve be installed in the gas line ahead of the tilting braising pan.
Natural gas and propane gas braising pans are equipped with fixed orifices and no adjustment is necessary. Gas burner
manifold is set at 3.5" W.C. (Water Column) for natural gas, and 10" W.C. (Water Column) for propane gas.
Never use an open flame to check for gas leaks. Check all connections for leaks using soapy water before use.
After piping has been checked for leaks, all piping receiving gas should be fully purged to remove air.
8
PAGE
OF 16
WARNING
WARNING
INSTALLATION & OPERATION MANUAL 10152 REV 0 (03/21)
Gas Skillets

Advertisement

loading

This manual is also suitable for:

Gs-40Gs-40n