Chapter 5: Activating, Commissioning and
Configuring the System
You can connect communication options at this stage, as described in Setting Up
Communication to the Monitoring Platform on page 39.
After completing all connections, activate and commission the system using the
inverter SetApp mobile application. You can download the SetApp from the Apple App
Store and Google Play before arriving at the site.
Internet connection is required for the download, one-time registration, and logging in,
but not required for using the SetApp.

Step 1: Activating the Installation

During system activation, a Wi-Fi connection is created between the mobile device and
the inverter and the system firmware is upgraded.
Before activation
Download, register (first time only) and log-in to SetApp on your mobile device.
Verify that the application is updated with the latest version.
If applicable, turn on all devices (battery, Energy Meter) connected to the inverter,
so that the devices may be auto-detected.
To activate the inverter:
 1. Turn ON the AC circuit breaker on the main distribution panel.
 2. Open SetApp and follow the on-screen instructions (scan the inverter bar-code;
move the ON/OFF/P switch to P position for 2 seconds and release).
SetApp creates a Wi-Fi connection, upgrades the inverter firmware and activates the
inverter.
Three Phase System MAN-01-00505-1.5