Chapter 5: Activating, Commissioning And Configuring The System; Step 1: Activating The Installation - SolarEdge SE Series Installation Manual

Three phase inverter with setapp configuration for europe and apac
Table of Contents

Advertisement

Chapter 5: Activating, Commissioning and
Configuring the System
You can connect communication options at this stage, as described in Setting Up
Communication with the Monitoring Platform on page 46.
After completing all connections, activate and commission the system using the
inverter SetApp mobile application. You can download the SetApp from the Apple App
Store and Google Play before arriving at the site.
Internet connection is required for the download, one-time registration, and logging in,
but not required for using the SetApp.

Step 1: Activating the Installation

During system activation, a Wi-Fi connection is created between the mobile device and
the inverter and the system firmware is upgraded.
Before activation
Download, register (first time only) and log-in to SetApp on your mobile device.
Verify that the application is updated with the latest version.
If applicable, turn on all devices (battery, Energy Meter) connected to the inverter,
so that the devices may be auto-detected.
To activate the inverter:
 1. Turn ON the AC circuit breaker on the main distribution panel.
 2. Open SetApp and follow the on-screen instructions (scan the inverter bar-code;
move the ON/OFF/P switch to P position for 2 seconds and release).
SetApp creates a Wi-Fi connection, upgrades the inverter firmware and activates the
inverter.
Three Phase Inverter with SetApp Configuration PN: SEXXK-XXXXIXXXX

Chapter 5: Activating, Commissioning and Configuring the System

 
 
    40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se25kSe27.6kSe30kSe33.3k

Table of Contents