Chapter 3: Installing the Inverter
Install the inverter either before or after the modules and power optimizers have been
installed.
CAUTION!
Do not rest the connectors at the bottom of the inverter on the ground, as it
may damage them. To rest the inverter on the ground, lay it on its back, front
or side.
NOTE
Use only copper conductors rated for a minimum of 90°C/ 194°F.
For the SE10KUS, SE20KUS, SE33.3KUS three phase inverters where opposite
polarity DC conductors are routed in the same conduit, 1000V rated cables
must be used.
Inverter Package Contents
One inverter with DC Safety Unit (if applicable)
One mounting bracket
Two Allen screws for fastening the inverter to the mounting bracket
DC Safety Unit sealing cover (if applicable, for use in case of inverter replacement)
Quick Installation guide
Identifying the Inverter
Refer to the sticker on the inverter that specifies its Serial Number and its Electrical
Ratings. Provide the serial number when contacting SolarEdge support. The serial
number is also required when opening a new site in the monitoring platform.
Three Phase System MAN-01-00505-1.5
Chapter 3: Installing the Inverter
19