Section 7: Mechanical System........................13 DP-2000 Sample Pump..........................14 YZ Filter Regulator............................14 Section 8: System Operation........................15 Preparing The System for Operation......................15 YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page i DP-2010 ver.05-2018...
Page 4
YZ Filter Regulator, Exploded View......................29 Link Plus..............................30 DuraSite Sample Vessel..........................31 Z-65 and Solenoid............................32 Z-65 Wiring Control Document........................33 YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page ii DP-2010 ver.05-2018...
1: f eCTion irsT hings bouT How to Use this Manual Getting Help The DP-2010 Operations Manual is a step-by- This manual provides solutions to typical ques- step guide containing the procedures needed to tions about the DP-2010 system. If the answer can not be found within this manual, contact YZ work with the DP-2010 System.
The number of times the solenoid output is ac- tivated is recorded by the onboard LCD stroke indicator. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 2 DP-2010 ver.05-2018...
YZ. Please contact your local representative or YZ toll free at 800.344.5399. For technical support call 800.653.9435. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 3 DP-2010 ver.05-2018...
DynaPak Sampler in Proportional-To-flow, or Proportional-To-Time Modes. • Probe Body Assembly: Provides direct mount connection to the pipeline. figure 1 YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 4 DP-2010 ver.05-2018...
(see AGA – 3 manual). B= The number of unobstructed, straight pipe diameters downstream (see AGA – 3 manual). YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 6 DP-2010 ver.05-2018...
To prolong the service of seals and diaphragm, adequate heat should be provided to maintain an operating environment above 32˚ F (0˚C). YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 7 DP-2010 ver.05-2018...
LinkPlus outlet to the product end of the sampler cylinder. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 8 DP-2010 ver.05-2018...
33. DynaPak electronics are rated for use in Class I, Division 1, Groups C and D hazardous locations. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 9 DP-2010 ver.05-2018...
Turn mode switches 1, 3, 4 to ON and switch 2 to OFF. 5-24 VDC (Voltage pulse) (20 msec duration min.) YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 10 DP-2010 ver.05-2018...
Page 15
7. Press the test button once to load the value into the memory. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 11 DP-2010 ver.05-2018...
4. Turn mode switches 1, 2, 3 to ON and 4 to figure 10 OFF. 5. Press the test button once to initiate the timer sequence. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 12 DP-2010 ver.05-2018...
Once the pump completes its stroke, the cycle is ready to begin again. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 14 DP-2010 ver.05-2018...
9. Check all connections from the sampler discharge to the connection on the sample. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 15 DP-2010 ver.05-2018...
1. Rebuild pump 2. Test the Sampler System performance and service, as needed 3. Replace Z-65 Battery Assembly. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 16 DP-2010 ver.05-2018...
The diaphragm chamber should not be disassembled unless one of these items needs replacing. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 17 DP-2010 ver.05-2018...
Page 22
16. Adjust the stroke adjustment knob to its original setting. 17. Pressure test the pump as previously described for proper operation. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 18 DP-2010 ver.05-2018...
20 to assure proper battery wire placement in the Z-65 enclosure. 5. Return the mode switches to their original positions. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 19 DP-2010 ver.05-2018...
This system may contain liquid and/ or gas high pressures. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 20 DP-2010 ver.05-2018...
NOTE: The solenoid must be connected to test the battery condition. Battery condition cannot be tested with a volt meter. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 21 DP-2010 ver.05-2018...
LED blinks on when the pulse input is received and removed. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 22 DP-2010 ver.05-2018...
NOTE: When the test is complete, move the jumper back to the factory position (far left Jumper switch location position). YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 23 DP-2010 ver.05-2018...
Page 28
NOTE: To obtain maximum battery life, choose the longest solenoid stroke rate possible. Jumper switch location for .1-9.9 counts (x.x) YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 24 DP-2010 ver.05-2018...
For example, a DP-2010FL has a B1-0047 body bushing and a C3- 0013 inlet spring along with all the other standard parts. YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com Page 27...