Operational Testing - GE Bently Nevada 3300/03 Operation Manual

System monitor
Table of Contents

Advertisement

Section 9 - OPERATIONAL TESTING

9. OPERATIONAL TESTING

To verify that the system monitor is functional apply power at the Power Input Module. The LED
indicating that the supplies are OK should turn on after 2 seconds.
CAUTION
Improper operation may
occur. Set -VT Jumpers in
the System Monitor and
Power Supply to the same
voltage (-18 VDC or -24
VDC).
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents