EBDK Reset Switch
Install EBDK Reset Switch for an MPLD2
1:
Install the back box according to standard electrical practices. The back box should be installed flush
and square for best installation results.
2:
Punch or drill an appropriate hole for conduit entry on the low-voltage (lower-left) side of the MPLD2.
3:
Remove the four screws that secure the lower cover on the left side of the MPLD2, and then remove
the cover (see image below).
4:
Remove the jumper from the Remote Restore Switch terminal block.
5:
Terminate two 1.5 mm
Switch terminal block.
6:
Pull the two 1.5 mm
installed single-gang back box.
7:
Strip 9-10 mm (3/8 in) from the ends of the 1.5 mm
8:
Locate the WAGO cage clamp connectors in the packaging. WAGO connectors are provided as a
means to connect the installed control wire to the harness wires provided on the EBDK-SWITCH.
9:
Open two terminal levers on each WAGO connector and insert the 1.5 mm
control wire for OUT and the RTN switch wire into terminals and close the levers. See the image
below for topology.
10:
Install the switch into the back box and secure using the two screws provided.
11:
Restore the cover to the lower-left corner of the MPLD2 and secure with the four screws.
DISENGAGE BREAKER TO TEST
PUSH TO RESTORE
Remove four
ALL FAULTS
MUST BE CLEARED
screws to
remove cover
Operation
Press the button on the EBDK Reset Switch to exit bypass/emergency mode and restore normal lighting.
EBDK Reset Switch
2
(16 AWG) wires to the OUT and RTN terminals on the Remote Restore
2
(16 AWG) wires through grounded metal conduit from the MPLD2 to the
MPLD2
NORMAL
WHEN LIT
FAULT
2
(16 AWG) installed control wires.
Remove jumper
and then
terminate wires
Page 3 of 3
2
(16 AWG) installed
EBDK
Reset Switch
ETC

Advertisement

loading