Download Print this page

W+W TRI-KLAPP 95 Mounting Instruction page 9

Ladder type 9, lift ladder for pits with a maximum depth of 1,5m

Advertisement

Available languages

Available languages

Mounting description
Article No. 78590
english
1.
1
foil bag with:
pos.
number
2.
2
3.
2
4.
2
5.
8
6.
1
7.
1
8.
2
9.
1
10.
1
11
2
1) Vertical mounting towards the landing door for a pit depth of 1,3-1,5m (preferred solution)
distance between apron and fl oor dowel fi xing
28 cm
mark dowel drilling
The clamp must be dowelled to the door sill at the correct distance,
so that the ladder can be put up with the required rake of 65°-75°.
Lift pit ladder TRI-KLAPP 95
parts list
twofold articulation ladder with chain
and fold away ground clamp with monitoring switch
dowels 14 x 75
screws 10 x 70
plain washers 10,5 DIN 9021
tapping screw
mounting instruction
drill d=3,5
fi xing hooks
twisting fi tting M20
sealing copound
labels „Put up site"
Put the ladder on the fl oor according to the
illustration.
© W
W 05/2007 Version 13
&
TRI-KLAPP 95
9

Advertisement

loading