Download Print this page

W+W TRI-KLAPP 95 Mounting Instruction page 10

Ladder type 9, lift ladder for pits with a maximum depth of 1,5m

Advertisement

Available languages

Available languages

Important!
Fold the ladder out and put it up in the required position.
For hydraulic lifts the dowels
must be sealed with the provi-
ded sealing compound.
Before you set the second dowel, align the ladder so that it stands straight in front of the door sill.
In some cases it is necessary to even the fl oor.
First compensate unevenness under the
ground fi xing clamp.
Dowel the second screw to the ground.
For hydraulic lifts the dowels
must be sealed with the provi-
ded sealing compound.
at fi rst dowel only one side
right!
Dowel the second screw
© W
W 05/2007 Version 13
&
ground fi xing clamp
TRI-KLAPP 95
wrong!
10

Advertisement

loading