Page 1
施工说明书 Instructions for construction Before product installation, read these instructions for construction carefully and retain it for future reference. OG3651Y[A] 2018.03...
Page 6
Contents 生产厂家与销售商 Contents 执行标准:GB 18145-2014、GB 28378-2012 产品型号:见包装箱上的标签 Contents …………………………… 产品名称:见包装箱上的标签 Detailed list ………………………… 生产日期:见包装箱上的标签 Service condition and attentions in 组装工厂:东陶(大连)有限公司 construction 电 话:(0411)87624383 ………………………… Attentions in construction and 厂 址:大连经济技术开发区东北二街17号 maintenances ……………………… Installation completion figure ……… 800-820-9787 Water nozzle installation ……………...
The products using this detailed list include: temperature. Do not allow skin to contact with the hardware surface DM359CF Copper alloy vertical single-handle double-control bath tub water directly. Otherwise, scalding may occur. 2. Do not reverse cold*hot water pipes. Otherwise, scalding may occur.
Attentions in construction and maintenances Installation completion figure Attentions DM359CF Copper alloy vertical single-handle double-control bath tub water faucet (convertible·having a handheld shower) 1. As the ceramic spool is a precise component, do not dismantle it without authorization.Otherwise, such poor conditions as water leakage, etc.
Page 9
Water tap installation Water tap installation 2.Connecting water inlet pipe 1.Install the buried main body. (1)Wind PTFE tape on the cold and hot water pipe and then connect with the body (1)After selecting the position of the water tap properly,cut four 10 mm expansion buried in the wall.
Production date:See the label on the packaging case (2)Take out the main body part of the water faucet and align with the buried main body.Insert the cold and hot water inlet pipe connector.Finally,fasten the screws to Assembly factory:TOTO(Dalian)Co.,Ltd. secure the wat. Telephone:(0411)87624383 Factory address:17 Dong Bei Second Street,Economic&Technical Development...
Need help?
Do you have a question about the DM359CF and is the answer not in the manual?
Questions and answers