Siemens SION 3AE5 Operating Instructions Manual page 51

Vacuum circuit-breaker
Table of Contents

Advertisement

Securing with a spiral
spring pin
Fig. 82
Cleaning and mounting threaded rods (22.1)
for contact arms (22)
9229 0025 176 0A
2019-08-05
When tightening the screws, hold the nuts against the tightening torque with a suit-
able screwdriver or socket spanner.
Tightening torque for
-
M12: 40 ±4 Nm
-
M16: 100 ±10 Nm
Tightening torques apply to greased threads only.
The conductor bars can be secured against twisting with a spiral spring pin accord-
ing to ISO 8748 or a dowel pin according to ISO 8752 — 4 × X*
A drill hole Ø 4H11 must be provided in the conductor bar (see Fig 81, horizontal ar-
row).
See dimension drawings.
)
*
X = Length of the spring pin, depending on the cross-section of the busbar in mm
Mounting contact arms and systems
Grease the screw-in section of the threaded rods with Vaseline.
Screw in the threaded rod and observe the screw-in depths for safe use (see
Table "Screw-in depths from contact surface in the upper and lower terminals",
page 50).
Screw the threaded rods to the contact surfaces.
Tightening torque for
-
M12: 40 ±4 Nm
-
M16: 100 ±10 Nm
Tightening torques apply to greased threads only.
End faces of the copper contact arms must be
-
roughened, cleaned and
-
greased with Vaseline.
End faces with silver-plated contact surfaces must be
-
cleaned and
-
greased with Vaseline.
Fig. 83
Cleaning and mounting contact arms (22)
Installation
)
mm — N — C.
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents