System Lineup; Supplied Parts; Outside View - Panasonic CZ-280PAH1 Installation Instructions Manual

Air handling unit control kit
Table of Contents

Advertisement

2. System Lineup

Capacity
10kW
U-100PE1E8
12.5kW
U-125PE1E8
14kW
U-140PE1E8
20kW
U-200PE1E8
25kW
U-250PE1E8
*Single connection type only.
*Mix connection with standard indoor units is not allowed.
*Applicable system is only above.

3. Supplied Parts

Part name
Self DrillingScrew
(4x13)
Screw(4x8)
Bracket
Installation
Instructions
AHU System
Check list
Insulation
Clamper
Thermistor
Notes

4. Outside View

Outdoor combination
U-100PE1E5
U-125PE1E5
U-140PE1E5
Form
User's manual
Weight of the control box:6.3kg
Connectable AHU-kit combination
CZ-280PAH1
CZ-280PAH1
CZ-280PAH1
CZ-280PAH1
CZ-280PAH1
Quantity
For fixing the product.
7
(Kit and its bracket)
For attaching remote controller.
2
(option parts)
For supporting the product.
At the time of shipment, be glued to
1
the back of the product.
1
For selection of AHU and
1
operating test run.
2
For thermistor insulation
For fixing thermistor ,and
making wire down to Blower
5
signal line.
3
Attached to the body of AHU kit.
1
Paste notes on an outdoor unit.
4
CZ-280PAH1
CZ-280PAH1
CZ-280PAH1
Notes

Advertisement

Table of Contents
loading

Table of Contents