ITI HOLELESS Installation Manual page 8

Telescopic
Table of Contents

Advertisement

SOLUTIONS
in motions
7. Make final adjustments to the pit support plate if the jack is slightly out of plumb.
8. For safety reasons it is advisable, and in some mandatory, to install a line rupture valve at the inlet port of
the jack when a hose is used as the inlet line.
9. It will be necessary to bleed air from each stage through the air bleeder valve located on each head.
It is important that the actual site conditions are as specified on the layout drawing. Before leaving the job, ensure
the total under travel and over travel ratios are specified. Any discrepancy should be noted and corrected before
shipping the lift to the customer.
Any small scratches visible on the stages should be polished with very smooth emery (400 grit).
8
Holeless telescopic jack

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents