Pro Refrigeration CHILSTAR Series Operation Manual page 12

Table of Contents

Advertisement

10 | Pro Refrigeration, Inc
STEP 3
Remove Front and Side Service Panels as applicable.
Open both of the glycol Valves by turning the handles counter
clockwise.
STEP 4
If a tank is installed on your Pro Chiller System ll it with water (no glycol at this time). Otherwise locate the
remote tank or water source and prepare the system to ush the piping with water.
Visually check for any leaks on the system before proceeding.
STEP 5
Turn each circuit's STAGE switch to the ON position. If your chiller is a single circuit system turn the CHILL-
ER switch to the ON position
Single Circuit Chiller System
Dual Circuit Chiller System
Your pump will energize and begin circulating water throughout the piping loop. Open all of the solenoids or
heat exchangers on the loop to get a complete system ush. Visually inspect all of your piping for leaks and repair
prior to proceeding.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ma series

Table of Contents