Pro Refrigeration CHILSTAR Series Operation Manual page 11

Table of Contents

Advertisement

CHILSTAR & MA SERIES CHILLER QUICK START GUIDE
e quick start guide is designed to be used in conjunction with a Pro Chiller System. As such, this guide as-
sumes that all that all electrical and mechanical devices are in the condition provided by the factory.
Please use the services of a licensed and skilled
refrigeration technician for chillerstart-up.
Contact Pro Technical Services with any
questions or concerns at
800-845-7781
STEP 1
Adequate clearance is required around the unit to provide air ow. Ideally you want at least 48" clearance around
all four sides of the system. Chiller systems located indoors require adequate ventilation to insure e cient opera-
tion. Contact the Factory with any questions about chiller location and placement.
Power must be supplied to chiller electrical panel. Check your local electrical codes, it is likely an
electrical disconnect/safety switch will need to be located near the chiller system. Check name plate or
manual for electrical power supply requirements.
STEP 2
Open Electrical Panel and make sure all electrical connections are tight.
shipment. Loose connections can cause motor failures.
Packaged Glycol Chiller Systems |
CAUTION Refrigeration ball valves are
shipped from the factory in the closed posi-
tion. Prior to operation adjust valves to the
open position.
WARNING Verify that all external power
sources have been removed before servicing
ese connections may loosen during
WARNING Do not turn on main power to
the chiller system until all of the electrical
connections are con rmed to be tight.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ma series

Table of Contents