Installation - Ozotech EOG Installation And Service Manual

Enhanced oxidation generator
Table of Contents

Advertisement

4.2 Installation

1. Mount the OzotechEOG to the Clack® control valve. A #2 Philips
screwdriver will be required.
a. Install clamp ring into OzotechEOG backplate receiver.
b. Install port clip into OzotechEOG backplate receiver.
c. Loosen clamp screw, slide clamp over valve injector cap.
Rotate OzotechEOG counterclockwise to secure port
clip. Tighten clamp screw.
2. Disconnect power to the control valve. Remove the front cover
from valve backplate. Release the control board bracket
from backplate.
3. Route the grey control wire from the OzotechEOG into Clack®
valve housing through the hole in the backplate, and through the
strain relief channel above to keep wiring in place.
a. Leave enough wire length to connect to the signal relay
terminal block of the control circuit board. Make sure the
wire is flush in the channel for proper bracket
installation.
b. Replace the control board bracket into backplate until it
"snaps" into place.
5.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents