Grid parallel

Advertisement

Last
update:
system_integration:hub4_grid_parallel https://www.victronenergy.com/live/system_integration:hub4_grid_parallel?rev=1456310763
2016-02-24
11:46
single phase setup diagram:
Note the jumper between terminals 1 and 4.
Meter configuration
Change the front selector of the AC sensor so it is not in the locked state. This will allow the CCGX to
automatically configure the meter. The front selector is located next to the display as indicated in the
image below.