Carrier BWCAAG000120 Installation & Operating Instructions Manual page 60

Contractors
Hide thumbs Also See for BWCAAG000120:
Table of Contents

Advertisement

Yearly maintenance program
Maintenance date
Disconnect power supply and protect the PC board to ensure it
cannot get wet during service
Using a digital manometer, check incoming gas pressure at the gas
regulator
Using a digital manometer, check pressure at bottom of gas valve
Check gas line size & length, ensuring it is adequately sized
Isolate & drain the boiler, check the expansion tank pressure is
correct for the system
Check that area is free from combustible materials, gasoline, and
other flammable vapors and liquids
Check that the Pressure Relief Valve is properly oriented in a vertical
position beneath the boiler
Check the correct working of the relief valve. Refer to manufacturer's
instructions on valve
Check the water domestic inlet screen, clean if necessary (BWC
model only)
Check the water inlet filter screen in the inlet manifold, clean if
necessary
Check the flowmeter filter screen, clean if necessary
Check venting type, length, installation, condition & screens
Visually check top of vent for soot. Call service person to clean. Some
sediment at bottom of vent is normal
Clean the screens in the vent terminal
Visually inspect all flue product carrying areas of the boiler including
the venting system and main burner for proper functioning,
deterioration or leakage
Verify that the vent is not obstructed. Check for and remove any
obstruction to the flow of combustion or ventilation air to heater
Venting must be pitched towards the boiler to allow condensate to
drain
Ensure that condensate drains are inspected and ensure that
condensate is being directed to appropriate condensate management
system or drain, as required by local codes
Check operation of safety devices. Refer to manufacturer's
instructions
Check fan and fan motor for deposits presence and damage
Check if there is any flue leakage from the heat exchanger flue outlet
and adaptors junctions. In case of leakage detection replace the
related gaskets (1).
Remove the burner door (8), check that combustion chamber is free
of deposits and proceed to clean with water and nylon brush.
Check the burner door insulation panel (6), gasket (4) and high
temperature glass braided rope (5) for deterioration, and if they are
worn, replace them.
Year 1
Year 2
Year 3
Year 4
60
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bwcaag000150Bwhaag000120Bwhaag000150

Table of Contents