Transporting The Machine; Lifting The Machine - Toro MB TX 2500S Operator's Manual

Tracked mud buggy
Hide thumbs Also See for MB TX 2500S:
Table of Contents

Advertisement

Transporting the Machine

Use a heavy-duty trailer or truck with full-width ramps
to transport the machine. Ensure that the trailer or
truck has all the necessary brakes, lighting, and
marking as required by law. Please carefully read all
the safety instructions. Knowing this information could
help you, your family, pets or bystanders avoid injury.
Refer to your local ordinances for trailer and tie-down
requirements.
Important:
Do not operate or drive the machine
on roadways.
1.
Lower the hopper.
2.
If using a trailer, connect it to the towing vehicle
and connect the safety chains.
3.
If applicable, connect the trailer brakes.
4.
Carefully load the machine onto the trailer or
truck.
5.
Shut off the engine, remove the key, and set
the brake.
6.
Use the metal tie-down loops on the machine to
securely fasten the machine to the trailer or truck
with straps, chains, cable, or ropes
Figure 16
1. Front tie-down loops
(Figure
16).
g185890
2. Rear tie-down loops

Lifting the Machine

Rotate the hopper and hoist the machine using the
lifting points as shown in
Note:
Take up the slack in the chain or straps to
properly balance the unit.
17
Figure 17
Figure 17
g324717

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

68141

Table of Contents