Download Print this page

Sutcliffe Play MTU011 Installation Instructions Manual page 3

Mini town tea shop

Advertisement

MTU/MTW011
Mini Town Tea Shop
Installation Instruction
6. Offer up Drainer & Cooker panels (MPP038 & MPP039), attaching each panel
to the deck support rails. Then using the steel angle brackets supplied
(PZA705) attach to the door and Pots & Pans panels see Pages 15 & 16.
7. Proceed to fix Under Deck Panels (MPP027x 2) to each post. Then attach to
deck panel using Steel Angle Brackets (PZA705)
8. Now proceed to fix the Gable panels (MPP042 x2) and Roof Detail panels
(MPP040 x2). Lastly fix each Window Panel (MPP037), see Page 11.
9. Using Steel Angle Brackets (PZA705), now attach Both the Roof Tile and
Large Roof Panels (MPP047 & MPP041) to the Gable panels.
10. Now tighten all the fixings, re-level the deck.
11. .Attach all fixing caps.
12. After checking the post bolts are tightened, ensure all open rubber caps are
filled with blue plugs, use superglue provided to secure in place, see Fig.15.
13. Pour concrete into foundation holes as in indicated by the Foundation Plan.
CONCRETE SHOULD BE ALLOWED TO SET FULLY (2/3 days at least).
During installation, care must be taken to prevent hazards to children. If you
are at all unsure or have any questions, please contact the contracts
department immediately for their assistance and advice.
Rev 02
Page 3

Advertisement

loading

This manual is also suitable for:

Mtw011