Installation Checklist For Weplaysmart By Hatch - hatch WePlaySmart Instructions Manual

Hide thumbs Also See for WePlaySmart:
Table of Contents

Advertisement

Installation Checklist for WePlaySmart by Hatch

Pre-training Checklist
 WePlaySmart by Hatch placement must be within 8' – 9'
of an outlet (10' power cord is included with unit).
 Keyboard, Quick Reference Guide, surge protector, main
power supply, cord cover and cleaner kit are included.
 Ensure bezel/microphone/camera equipment is adhered
tightly to tabletop.
 Ensure teacher sticker and serial number stickers have
previously been adhered next to power button.
 Inform customer best to keep original packaging (if
possible), but not a requirement.
 Show customer QRG location in keyboard shelf.
 Have a second person ready for any moving, lifting etc.
of the table. The table is heavy and should not be rotated
on the bezel or the legs, which necessitates having an extra
person on site to help with installation.
Post-training Checklist
 Unit powers on and automatically launches into WePlaySmart by Hatch.
 Connect to the Internet (if available) so that Updater can work, Tech Support could login to the unit and
we can present online trainings.
 Clean the table's surface with the included cleaning kit before leaving the customer's site.
 Ensure the main power cable with cord cover is running under the table to limit length across classroom.
 Check the cord cover fits nicely over the main power supply. If not, it is suggested to cut cord cover (with
scissors or other device) to fit the power supply nicely.
 At least one classroom and two children have been set up for the teacher during training.
 After training, you should remove your child information. You may leave the Teacher's child, if desired.
 Sign-up customers on the Hatch Learning Management System using Customer ID (Customer number from
MAS system) located on order.
Last Revised Date: 6/26/13
3 |
P a g e
V 1.1

Advertisement

Table of Contents
loading

Table of Contents