Download Print this page

ABB TOTALFLOW X G4 Series Startup Manual page 5

Flow computer; remote controller

Advertisement

cord connector. Slide the nut, sealing ring and grommet over
the RTD cable. Insert the cable through the body of the cord
connector. Allow enough cable to extend into the unit for
connecting wires to the RTD termination block. Secure the
cable with the grommet, sealing ring and nut.
NOTE: The charging source and power should be removed from the unit
before performing any field wiring.
2C
Connect the RTD probe to the XFC
follows. Before making connections to the terminal block,
remove spade lugs, if attached, and trim the wire ends back
¼". Remove the J7 terminal block from the XSeries
electronic board. Loosen the terminal block securing screws,
insert the wire and then retighten (see Figure 5). Reinstall the
terminal block with the wires attached.
Step 3
Battery Installation
3A
To extend the life of a battery pack, fully charge the battery
prior to installation. A system using solar panels may not fully
charge the battery. Also, a fast charge, which the solar panel
cannot provide, improves the life of the battery (See Tip
below).
3B
Remove the unit's battery cover plate, and insert the battery
pack (See Figure 6). Insert the battery pack with its long
dimension facing outward. When the cover is reinstalled, it will
fit snugly against some battery packs. The screws can be
loosened to accommodate large batteries.
Figure 5. RTD Terminal Block Wiring
Figure 6. Battery Compartment
's RTD connector as
G4
main
G4
5

Advertisement

loading

This manual is also suitable for:

Totalflow xfcg4Totalflow xrcg4