Download Print this page

Vag GA Industries FIGURE 200 Installation, Operation And Maintenance Manual

Rubber flapper check valve

Advertisement

Quick Links

INSTALLATION, OPERATION AND
MAINTENANCE MANUAL
FIGURE 200
RUBBER FLAPPER CHECK VALVE

TABLE OF CONTENTS

Introduction .................................. 2
Receiving & Storage ....................... 2
................. 2
Valve Construction ......................... 2
Installation ..................................... 3
Preventive Maintenance .................. 3
Trouble Shooting ........................... 3
Disassembly .................................. 3
Reassembly ................................... 4
Visual Position Indicator ...................
4
Parts & Service ............................... 6
Repair Kits .................................... 6
Warranty ....................................... 6
234 Clay Avenue • Mars, PA 16046 USA
Telephone (724) 776-1020 • Fax (724) 776-1254
E-mail:
info-ga@vag-group.com
Manual Number 200-IOM-110520

Advertisement

loading

Summary of Contents for Vag GA Industries FIGURE 200

  • Page 1: Table Of Contents

    Limit Switch Installation/Adjustment …. 4 Backflow Actuator Installation …. ….…. 5 Parts & Service ………………..…….…. 6 Repair Kits ……………………………… 6 Warranty .……………………………….. 6 234 Clay Avenue • Mars, PA 16046 USA Telephone (724) 776-1020 • Fax (724) 776-1254 E-mail: info-ga@vag-group.com Manual Number 200-IOM-110520...
  • Page 2: Introduction

    (if provided). VALVE CONSTRUCTION eye bolts or rods through flange bolt holes to lift The standard GA Industries Figure 200 Rubber large valves. Flapper Check Valve is constructed of rugged ductile iron with a reinforced rubber flexible disc.
  • Page 3: Installation

    open top sealed with a cast cover (2). The leakage occurs, allow gaskets to absorb fluid flexible disc (3) is retained by the cover. and check torque and leakage after 24 hours. Do not exceed bolt rating or extrude gasket. An optional valve mounted position indicator, with or without limit switch, is available to PREVENTIVE MAINTENANCE...
  • Page 4: Reassembly

    performed by a skilled mechanic with proper WARNING tools. A power hoist should be employed when Do not field install the visual position indicator disassembling large valves. unless the valve is in the horizontal position or damage to the indicator assembly may result. WARNING Once the indicator is installed, the valve may be Lock out any associated pumps.
  • Page 5: Backflow Actuator Installation

    To install the limit switch on the visual position valve and relieve line pressure between the indicator assembly: check valve and isolation valve. To open the • valve, loosen the jam nut (15) turn the T-handle Attach the limit switch mounting bracket clockwise.
  • Page 6: Parts & Service

    Rod Wiper Urethane on the valve nameplate and contact: Rod Seal Buna-N Rubber Backflow Tube Brass Jam Nut Stainless Steel VAG USA, LLC Backflow Rod Stainless Steel 234 Clay Avenue T-Handle Stainless Steel Mars, PA 16046 USA Setscrew Stainless Steel...
  • Page 7 This page intentionally left blank...

This manual is also suitable for:

Ga industries figure 200-dGa industries figure 200-dbfGa industries figure 200-dpiGa industries figure 200-dbfpi