INSTALLATION INSTRUCTION
DRILLING / MILLING FOR CABLE ROUTING LATERALLY
Drilling for cable routing
Grommet for top track (side)
1_ Example concrete ceiling
Adjust the length of the cable channel and stick it as shown
into the top track.
Push the cable in direction of drilling / milling.
Connect the LED control.
The LED control is to be stored on site.
Cable channel
2_ Insertion of the cable channel
16
Cable channel
The holes must be
free of burrs.
The LED control is to be
stored on site.