INSTALLATION INSTRUCTION
HOLES FOR CABLE ROUTING WITH SUSPENDED CEILINGS
Place the LED control on
the suspended ceiling.
grommet for
top track (top)
approx.
10 mm
1_ Example: Suspended ceiling, positioning of the hole for the cable guide
2_ Hole for the cable guide
Ø 11 mm
The holes must be
free of burrs.
approx. 10 mm
15